Document accessible gratuitement (après connexion)
This technical bulletin is intended to be used in combination with CEA 4001. It supplements the CEA 4001 rule by providing specific requirement for waste recycling plants, waste sorting plants (Material Recovery Facility) with or without energy recovery.
Typical processes in a waste recycling plant that are covered in this technical bulletin are indoor receiving area, refuse/waste holding pit, shredder, sorting area and conveyors.
Unless specified differently in this technical bulletin, all the provisions of CEA 4001 shall be fulfilled.